Chapter 15 – Hydropower Development: Return of a Crisis on the Upper Reaches of the Yangtze River
(4,461 words)

In Chinese Research Perspectives on the Environment, Volume 3 | ISBN: 9789004268791

Abstract

While the Comprehensive Utilization Plan for the Yangtze River Basin was under revision, a large number of hydropower projects in the upper reaches of the Yangtze River were hastily launched. Because of the rush, basin geology risks, ecological safety, and concerns over sustainable utilization of wate…

Cite this page
Zhiheng, Bao, “Chapter 15 – Hydropower Development: Return of a Crisis on the Upper Reaches of the Yangtze River”, in: Chinese Research Perspectives Online, Edited by: International Advisory Board Chinese Research Perspectives Online. Consulted online on 27 May 2018 <http://dx.doi.org/10.1163/2213-6002_crpn_C9789004268791_019>
First published online: 2014



▲   Back to top   ▲